| |||
| |||
|
C - INSPECTION AND TESTING
Target time 1 hour 30 minutes On completing the composite installation, each candidate will be required to carry out prescribed pre commissioning electrical installation tests in accordance with the lEE Wiring Regulations (BS 7671). Each candidate will be supplied with necessary instructions, a copy of the current lEE OnSite Guide, test results sheets and a range of instruments from which to select and prepare the one appropriate for each test. back | |||
|