A3 FUNCTIONAL TESTING

Target Time 30 Minutes

After the installation has been inspected and tested each Candidate will be required to demonstrate that the following final circuits operate correctly:
  • Two-way and intermediate switched lighting circuit
  • Operate the Landlords Key Switch
  • Operate the Emergency Luminaire Key Switch to effect simulated mains failure
  • Tubular heater
  • Motor and control circuit
back