| |||
| |||
|
A1 COMPOSITE INSTALLATION
Target time 30 minutes Candidates are to carry out a visual inspection of the completed installation as required by the current edition of the lEE Wiring Regulations (BS 7671) and establish whether the results are acceptable by completing the Visual Inspection test sheet provided. back | |||
|