PVC/SWA/PVC Cable 10mm˛ four core
|
Measuring, cutting to length, installing and terminating between pre-fixed equipment.
|
|
Metal Conduit 20mm
|
Measuring, cutting to length, filing and reaming, bending, threading, installing between pre-fixed equipment.
|
|
Main Equipotential and Supplementary Bonding
|
Measuring, clipping and dressing, terminating and fixing bonding clamps on service pipes etc.
|
|
Mineral Insulated Cable (PVC sheathed) 4L 1.5mm˛ MICC
|
Measuring, cutting to length, shaping, dressing, securing, terminating, glanding; identifying conductors and
connecting between pre-fixed equipment.
|
|
Circuit Wiring - Lighting Circuit
|
Install PVC insulated cables for the two-way and intermediate lighting circuit. Install key operated override 'on'
switch adjacent to the intermediate switch.
|
|
Emergency Luminaire
|
Install FP200 2 core and earth cable between the plastic dado trunking and 20mm end box. Connections to be
to the Luminaire Support Coupler (LSC).
|
|
Industrial Socket Outlet (400V)
|
Install and connect the 16A triple pole and earth socket outlet to the output terminals of the 20A TP&N switchfuse.
|
|
Three Phase Motor Circuit
|
Installing cables in trunking and conduit; terminating and making connections between a three phase squirrel
cage motor, a motor starter, a remote start/stop/inch station and run and trip warning lights, with the aid
of a wiring diagram (Figure C).
|
|
SRCD
|
Install cables in metal trunking to SRCD.
|
|
Circuit Wiring - Ring Circuit
|
Installing cables in metal and PVC trunking and PVC conduit; terminating and making connections from the
distribution board to:
- a ring circuit of 13A switch socket outlets.
- a spur to a 13A socket outlet including flexible cable to a tubular heater via a 13A plug.
|